Construction of “Golden Triangle” rainwater networks starts in Klaipėda!
Year
2025-2026
Location
Klaipėda
Status
In progress

After almost two decades of planning, Klaipėda is taking a significant step towards the development of the city's infrastructure — the construction of surface sewage networks on the territory of the Golden Triangle begins. The area between Tilze Street, Vilnius highway and railway has long been considered strategically important for the development of the port city, but so far its development has been hampered by a lack of infrastructure. Now this is where the changes begin.

  • More than 1 km of stormwater networks (1.6-2.4 m in diameter) are being laid.
  • Soil excavation work to a depth of 8 m.
  • the rain collector crosses five railway tracks.
  • The infrastructure solution necessary for the further development of the territory is being implemented.

 

Project value: €5.7 million (excluding VAT)

Join us!

We always welcome motivated people!
Open positions